Is there a setting in Workfront to send a notification when a project is shared with someone, a team or a group? Or will they only see the project show up in their view? Is there a way to notify the people the project was shared with even if they aren't assigned to anything on the project?
I am looking for best practices in setting up and managing layout templates. Has anyone run into issues where groups have different layout templates but users work in with objects in multiple groups.
Hi Again, I pulled a report of projects and added "Program Name" and "Company Name" as columns. I would like to be able to quickly go down the line and update both of these fields in all of our projects, but I don't have the in-line editing option within the report to update Program Name and Company Name. Am I missing something? Is there a better way to do this? Thanks!
I want to double check that extending task duration in a project that has fallen behind (Progress Status At Risk, Behind or Late and Project Condition At Risk or In Trouble) will never return the project to On Time-On Target. I’ve tested this a bit and found extending the duration dates will change the progress status and project condition to other levels, but the project never goes back to On Time-On Target. This makes sense to me since the progress status calculations are based on Estimated and Projected Completion Dates, which are system set. Are there project date situations that I missed in testing where changing task duration can reset an At Risk or Behind progress status to On Time?Thanks
Hi, I must be missing something very basic. Any chance I can get one of you to go over my valueexpression and see what I am missing? I am working on a project report. I have a milestone process assigned, and milestones assigned to key tasks. I want to report milestone status at project level and I only want one response, either the last completed milestone or the next milestone not yet completed. However, as you can see below my output gives me each milestone. I was hoping it would only return the first one that met the criteria. Help? Column NameLast Completed MilestoneNext Incomplete MilestoneOutputM0 Pre-Planning: 12/10/24M1 Kick-Off: 12/17/24[should only show last milestone named M1]M2 DevelopmentM3 Compliance ApprovalM4 Launch[should only show first milestone named M2]Text Modedisplayname=Last Completed Milestonedisplayname=Next Incomplete Milestone listdelimiter=<br>listdelimiter=<br> listmethod=nested(tasks).lis
Hi,I'm just getting started with custom expressions in text mode so my questions may be basic. I have 2 fields on an hour report that I am having trouble with. The first is that I have a project # column and a project name column that I would like to concat into one column that displays the project number and the name together. I feel like this should be fairly simple but I must have part of my syntax incorrect. It just comes up blank. I'm struggling with what the listmetod and value format should be and wonder if that is where I am going wrong.displayname=Project listdelimiter=<div> listmethod=nested(projectUserRoles).lists type=iterate valueexpression=CONCAT({project:Project #},":",{project:name}) valueformat=customDataLabelsAsStringThe text mode of the 2 fields I am trying to concat are:linkedname=projectnamekey=view.relatedcolumnnamekeyargkey.0=projectnamekeyargkey.1=Project #querysort=DE:project:Project #valuefield=project:Project #valueformat=customDa
Has anybody created an integration between Adobe Analytics and Adobe Workfront? For example to pass actionable items from data thresholds in AA to AWF? Like troubleshooting an underperforming campaign?
We came in to work this morning and found that our Workfront instance had been migrated to the 'Admin console' login process without any prior notice or communication from Adobe. Did this happen to anyone else? We have a support ticket open to see if we can roll this back. As far as I know they still haven't addressed auto-provisioning of new accounts, which is something we were waiting for them to clear up before migrating. Our users so far have been very confused by the change
Hello!I am trying to pull a report that pulls specific criteria including if one currency field is greater than another. What would be the best way to do this? For example, in my screenshot, I know we can't put the field name in the box unless you're in text mode, but I'm trying to show what we are attempting to pull. Does anyone know the best way to write this out in text mode?
Hi, I have added a calculated field with this code IF({DE:ROC | Channel Type}="Website"&&{DE:ROC | Request Type}="Localization"&&{DE:ROC | Production | Complexity}="Low","43","23") and want to keep it recurring. What will be the further code?
Dear all, my goal is to return the information from the field Milestone: name to Parent milestone in each line (also in lines that are new created in projects)ive managed this for 1 parent level deep but not to level 2,3 etc... as shown below:i created this by using the code:textmode=truevaluefield=parent:milestone:namevalueformat= in addition to this i would like to Rename the information automatically. can any one help me out?
We would like to get feedback from our users in Workfront and are trying to figure out how to solicit and take in that feedback. We are looking specifically to get the feedback from team members who have submitted requests and we want the feedback on how we served the request. Their requests are always converted to projects. I have one person on my team who has suggested assigning a task to give feedback in the resolving projet to the requestor. The task would have a form to fill out. This seems like it will be confusing to the requestor - tracking the task, finding the form, etc. Has anyone solved for this and if so how did you do it?
Has anyone been able to read cross project predecessor information in Fusion? We are trying to read the predecessor projected completion date to then reset the planned start date on the second project to have accurate capacity planning. Project A - Task 3 need to be completed for Project B Task 1 to start. I'm not seeing where I can pull predecessor from a different project. Only the predecessor information from that same project.
Hello! I have a basic text mode function I found elsewhere on here, but I'd like to improve it a little bit. I am using a program report and I used the below to display the active projects going on under the program. How can I link them so they are easily clickable and filter to ones in a status called "Active" OR "In Review"? And, bonus points if they can be each on a separate line. Thanks so much to all the text mode heroes out there!displayname=Projects listdelimiter=<hr> listmethod=nested(projects).lists type=iterate valuefield=project:name valueformat=HTML
Text mode is my kryptonite! We use alot of automation in our workflows. I am trying to create a new dashboard view representing specific elements tied to our automation scenarios. We have parent tasks that represent our collateral routing channels in a more holistic project. Within those channels we have many nested tasks as well as assignees. I need to represent the global channel collateral status but with specific assignees within the nested tasks (we call them route owners and they can change depending on the type of collateral routing as well as have more than one route owner). Is there a way to pull specific assignees in at this more global level? We do have assignees to specific job roles and we also have tagging on the specific tasks that I need to point to to get the assignee. Any help would be much appreciated. Thank you!
Hello! I'm trying to create a project report that shows actual duration of projects. One column is pulling the template duration, but I also want to show in a separate column the duration the project ACTUALLY took. Taking the actual start date and add up the actual completion date and show what that duration is (keep in mind, we have our schedule set up not to include weekends and holidays so it's not as straightforward as adding the days between the two dates). This will then show me a comparison to what the project SHOULD have started vs when it did and then how long is actually took. Ultimately, I want to show two things: 1) are our templates set up accurately for the duration needed and 2) we are allocating enough time, but our projects are starting too late; therefore we're always late getting them done. Warning: I do not understand text mode well at all. HA!
Hello community. Our users are saying that some time between 12/19/24 and 12/23/24 something changed in their Time Sheets when logging against a Project, when they are selecting Hour Type. It used to be "Issue Time". However now its "Project Time". I can see in the Hour Type configuration page there are two hour types, Issue Time and Project Time. However I think that Issue Time is reserved for Logging Hours against Requests. What makes this more confusing. is we had re-labeled "Projects" in our Layout Template to be "Issues" And I think maybe that carried over to re-label the Project Time Hour Type. And maybe its not now?However, did something change around that time that is now forcing them to use Project time?
Hi All,recently I found a calculated field in our instance created by someone earlier, that includes this reference:{portfolio|portfolioMM}.{name}Could someone please explain me what this is / how it is different from {portfolio}.{name}I searched the forum and this came up a few times, along with {programMM|program}.{name}, but w/o any explanation about the MM part.Thank you,Tibor
Hi All, I trying to workout a fusion scenario that once a user is assigned to an issue, they are immediately assigned to the first stage of the approval process for the issue. All assistance is greatly appreciated.
Is there a way to see task milestones in individual projects from a Program level? I am looking for a way to view/share a Gantt chart that shows multiple projects within a Program and the various steps required for each of the projects. Currently when I open a Gantt chart view within a program, it just shows a single line for the project as a whole.
Hi folks, seeing if anyone has a way to do this...I have a task report pulling values from a task custom form on all projects via templates that indicates if the project met or didn't meet the SLA (based on the task custom form looking at when a certain set of tasks in the project was completed vs the SLA). I have this working fine, and reports with bar charts show projects that didn't vs. did meet the SLA. What I'm after is if any the projects ever when to On Hold status any point in the project. I want to add this as a report column and not a filter since I don't want to filter them out, but just to give context in a column to show for example XYZ projects that didn't meet the SLA, the column can show me if it ever went On Hold (not tasks, the project itself). Is this possible in a text mode value expression in a column? I tried messing with cicontains=On Hold and project:noteText but not getting anywhere.
I tried to see the projects under the program( which I could see it before) however, the below error message shows up. I refresh the page, re-start workfront and PC, did everything I can do, but still I cannot see the list of projects ( only project I cannot see...)"An error has occurred and we are working to resolve the request. To continue with your work, try refreshing this browser page." If there are anyone knows how to fix this? That would be super helpful!
Hello,From my testing I do not think this is possible but I thought I would ask the community...I would like to display the {plannedCompletionDate} value the color "blue" IF the Task/Milestone is 100% complete...etc.each column has a unique milestone IDeach row is a project My text code...displayname=Planned Completion Date of R1 Design Complistdelimiter=<div>listmethod=nested(tasks).liststype=iteratevalueexpression=IF({milestone}.{ID}="xxxxxxxxxxxxxxxxxxxxx",CONCAT({plannedCompletionDate}))valueformat=HTML
Hi!I'm using a kick-start to generate a slew of new issues for a queue. Many, if not all of the issues need to have multiple users assigned to them. I can't figure out how to assign multiple users using the "setAssignedToID" field. Is this even possible? Thank you for any recommendations you might have! Corey
I ran a task hour report, but it’s pulling duplicate task entries. When I use the matrix to sum the hours by job role, the results are skewed. It seems that if someone logs time more than once on the same task, the report isn’t showing each time entry individually. Instead, it’s summing the hours first and then applying that sum to each duplicate entry, which inflates the totals. Has anyone experienced this issue? Is there a way to configure the report so that each time entry on a task is shown separately instead of using a summed value?