Explore product-specific spaces to ask questions, share insights, and learn best practices.
Recently active
Hi All, I have a project created with a set of tasks. I had updated duration, planned hours and assigned the tasks to an agile team. Once the tasks were assigned to the agile team, those tasks were showing up in the team's backlog. When I added few tasks from the backlog to one of the iterations, the duration of the tasks in the tasks list in the Project page got updated to very large numbers (57 days) whereas the original duration i had updated is very less ( 1 Day). Not sure why this is happening. How to retain the original duration of the task after it is getting assigned to an iteration. Please provide your inputs. Thanks in advance.
Hi, We are in the process of building comma separated values calculated fields to map to AEM tags. Currently there are multiple fields from Workfront that need to be mapped to one AEM Tags. In Workfront we have multiple fields for Audience, Channel & Social Identity but in AEM, those values are combined in tags. Based on this post, we will need to create a calculated field to combine the multiple fields in WF and to be able to separate those by commas: https://experienceleague.adobe.com/en/docs/workfront/using/administration-and-setup/configure-integrations/configure-aacs-integration This is how we build our calculated field: CONCAT({DE:AudienceType},", ",{DE:Audience - Engineer},", ",{DE:ChannelType},", ",{DE:ChannelType - Adv},", ",{DE:ChannelType - Digi},", ",{DE:ChannelType - Digi - Mobile},", ",{DE:ChannelType - Event})Each of the fields we have above are multi-select dropdown fields. I am using the expression ,", ", between each fields to
Hello community! I am hoping to create a report that shows the Oldest task in a project (i.e. the FIRST task). We would like to track projects that take more than one sprint to complete and currently, we track the sprint ID on each task with a custom field.It would be okay if this is 2 reports but ideally it would be: Project Names | Oldest Task Name | Oldest Task Due Date | Oldest Task custom field | Newest Task Name | Newest Task Dues Date | Newest Task Custom field the tasks could also be on 2 lines for each project, I don't mind.
I am creating a task report to enable project owners to bulk update task statuses and I need a column on the report that shows what the next task on the applicable project is. I am not looking for the next ready to start task - what I need is for the project owners to be able to see what the next task up is going to be before they mark the existing open task as complete. The report is already pulling in just the current ready to start task on a set of projects. I am assuming that this would be a text mode field but I'm not having any luck figuring out the syntax I need.
Is it possible to tie multiple projects to one request?
I have the same multi-select dropdown field on request, project and task forms that only wants to populate the field on the project form when converting a request to a project using a project template. The project form is in the project details section and the task form is in the task details on the project template. I was hoping that the task field would auto-populate just like the field on the project form does, but I have to manually set the selection. Is it not possible to have the selection synced on the same filed in the three different forms?
We have the functionality called API trigger email in the campaign. By any chance using the event forwarding as a trigger solution for Adobe journey optimizer?Because we have triggers earlier using pipeline, we had the email trigger option in adobe cloud system. Sameway, do we able to do here?
I have completed the integration of Adobe OneTrust and Adobe Launch by following the instructions on this page: OneTrust Integration Guide.I have added conditions in each rule regarding targeting and performance based on the OptanonActiveGroups provided, with everything set to opt-in by default.However, I am encountering an issue with the GPC signal. When it is activated, it should block all cookies, but there is a delay in setting the OptanonActiveGroups, which causes some pixels to still fire.Need to help to tackle this.
I am planning to create a new profile where unique namespace is going to be created which is not available for any other profile. it is a proper profile upload where we enable the dataset for profile enabled. if i use that namespace id for pseudonymous profile deletion. Will that work ?
Should I put different offers into one Offer Collection?As an example:1. 5% discount - Collection 12. Free delivery - Collection 2 And then in evaluation Criteria put them in specific order1. Collection 22. Collection 1 On the other I can put everything into one Collection and then in Evaluation Criteria every offer would be evaluated based on the priority??
Hi Everyone, Unlock the full potential of Adobe Experience Platform and apps at The Skill Exchange event through expert-led sessions. Save your spot and register today Join us on Wednesday, August 13, for a power-packed day of learning focused on Adobe Journey Optimizer (AJO) and Real-Time CDP, all designed to help you maximize customer impact, simplify workflows, and scale personalization. Type Title Speaker(s) Keynote Opening Keynote Klaasjan Tucker & Nimasha Jain, Adobe Real-Time CDP Balancing AI Personalization, Privacy, and Data Security Ketan Bhanushali & Lalitha Kavutharapu, Prudential Real-Time CDP Maximize Media ROI with RTCDP Collaboration Giuseppe Cagliostro, Wavemaker Journey Optimizer Calming Customer Chaos: Tackling Complex Journeys in AJO Adam Wilson, Air Miles Journey Optimizer Solving Adobe Journeys Beyond Email: Catch Errors Early Stephen Cave, World Vision & David Kangni, RiteAid More to Explore The Skill Exchange runs August 13–21, spot
Current Behavior - Currently in Workfront, when a custom form is attached to an object, users may encounter an issue when filling out metadata—especially with fields that are associated or dependent on each other. For example, if a user selects a value in one field, which triggers the display of a related field, and then enters information in that associated field, changing the original selection does not automatically clear the data previously entered in the dependent field. As a result, the old data remains, and the user must manually go back, remove the previously selected information, and re-enter the correct details. Proposed Solution - It should automatically clear or reset the values of dependent fields when the controlling field changes.
Hi all, I am working on a web application where I need to apply field validation on several inputs on the first page of the survey, I do believe it can be done via initialization script and approval script tabs. Here are the fields that I am looking to validate: A - Should not allow future dates B - Must be an @specificdomain email C - Exactly 8 alphanumeric characters (no prefixes like #) D- Limited to 4 characters E - Must follow a valid telephone number format F - Introduce a strict validation that only allows the email. *The letters are used to reference the variables. Any guidance would be highly appreciated. Best, Celia
Is there a way to check, either via API or UI, the specific times at which my streaming segments were evaluated within the last 24 hours? I could not locate in Monitoring Dashboard also didn't find any API.
Is there any way that we can use directly to calculate the Customer Life Time Value through AEP-RTCDP, which Marketeer can directly use to find their customer's Lifer Time Value using AEP UI, I found a way using Data Distiller, but I don't think that Marketer can write so much SQL queries. So Just looking for any way that can help me to draw some business decision based on my customer's LTV.
when i open any audience including having thousands of profile qualified under the audience, it still show zero sample profile in the segment UI. I have checked for few other segments too. for most of them it shows blank screen, and for segment it shows 'check back later' message.
at what time we need to craete batch and stream audience need to create ?why only we need to evening time?
Hi, I have many audiences activated to destinations such as Facebook, The Trade Desk and Adobe Target. Circumstances may require these audiences to be edited to reflect updating targeting or suppression rules. Is there a function within AEP (or workaround) that allows for pausing the segment refresh to the destination? For example, Trade Desk keeps the most recent set of profiles (Audience still is activated to the destination hence why it would still appear), but AEP does not send new profiles until the segmenting rules have been updated, and the audience activation has been 'un-paused'. Thanks!
Events are not transferred from Profile to Data Lake automatically?If the events from Profile expires then its not accessible anywhere?https://experienceleague.adobe.com/en/docs/blueprints-learn/architecture/architecture-overview/media_18406e473866b77a8a899bcbef51a95234908240c.svg?width=2000&format=webply&optimize=medium
Hey Community, I have a question related to pushing Audiences to a destination. Providing an example first:Day 1 -> I pushed some audiences to META with the personal email address as the mapping.Day 2 -> I pushed more audiences to the same META destination, but I changed the mapping to phone number and deleted the email address mapping.My question is, will the mapping change on Day 2 impact audiences pushed on Day 1? I see that lately, a lot of identities are being excluded. I'm not sure if the wrong mapping has been used or that a change might impact old pushes. Thanks 🙂 Ricardo
Currently, Marketo’s report subscription feature only allows users to select the day for report delivery, without the ability to specify a time.I’d like to propose an enhancement to include a time selector within the subscription settings. This would allow users to schedule reports not just by day, but also at a specific time, enabling more precise report delivery aligned with business hours, stakeholder availability, or operational workflows.Adding this flexibility would improve usability and scheduling control, especially for teams working across different time zones or requiring reports before key meetings or decision-making windows.Thanks
To be part of SME club, below were the requirements mentioned on the protal.https://certification.adobe.com/community/sme?tab=sme1 Requirements to join and maintain your status:Must have an active certification in an Experience Cloud applicationCurrent signed NDA (annually)Complete two online training tutorials in writing questions (required for exam projects) Can someone help me with the details? how & where to get the signed NDA? Where can i find the online training tutorials in writing questions? Thanks in advance!
We are receiving data into (AEP) from multiple sources via Azure Data Factory , using SFTP for file transfers. The files appear successfully in the target location at first, and we have a Dataflow set up in AEP to process them.However, when the Dataflow is triggered, it fails with an error, and we’ve observed that the source file disappears after the Dataflow running. Within our ADF pipeline, there is a step where the files are encrypted and then deleted after processing. While we’re not entirely certain this deletion is directly causing the Dataflow to fail, it seems likely that the file is being removed before the Dataflow has finished reading it.Error summary CONNECTOR-1001-500: Error in copying the data from Source.Error code: 2200Description : /mapBVToAEP_DailyEvents_20250707.jsonl.pgp is not a valid file path
Currently, Marketo does not provide real-time notifications for individual CRM sync errors. Instead, error notifications are compiled and sent to subscribed users once per day.This means that if any record fails to sync with Salesforce (or another connected CRM), there is no immediate alert or notification at the time the error occurs. As a result, sync issues may go unnoticed for several hours, potentially delaying remediation and impacting campaign execution, lead routing, or reporting accuracy.Implications:Sync failures are only visible in daily summary emails or within the Marketo Notification section.Manual monitoring of high-priority workflows or critical leads may be required if timely resolution is needed.So Just had an idea that the real time notification should be there for the same. I know in this case use can got lots of alerts if it's happened but still there should be a way to notify use at least hourly basis.Thanks,
Can we track Success/failure of load on a page within adobe analytics. What metrics dimension do we use to track it for reporting ?
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.